The city started operating a primary treatment plant in 1955 and was up graded to secondary treatment in 1990. The average daily flow of the plant is 350,000 gallons per day, but is designed to handle as much as 720,000 gallons per day. The collection systems is throughout the city, with 7 lift stations. We treat the waste water and maintain the systems in Henderson, WV. We have 6 employees who maintain the collection system and the treatment plant. The effluent is tested monthly as per WV Department of Environmental Protection rules, with certain maximum limits. These limits for the plant are far below the maximum allowed limits.

 